The brief
To install a new driveway, and landscaped flower garden areas to the front of the property. This had to be inline with the customers own plans that they had spent 2 years formalising.
The driveway had to be hardwearing & capable of taking the weight of a lorry for heating oil deliveries and provide enough parking for at least 4 vehicles.
There was to be no steps in the paths where any change of levels existed, gradual slopes were acceptable. The finished area had to be as flat as possible with drainage to run into an underwater storage tank. Other areas required a new ironstone wall along boundary & and an additional paved area for the easy moving of wheelie bins from outbuildings.